How to Balance Sewing Line?

How to Balance Sewing Line?

 

Balancing means even distribution of work load. To distribute work load Pitch Time is calculated. Pitch Time is the regular interval at which products come out of an assembly line.

 

Pitch Time = SAM / Total No of Operators

Piece Flow per Hr = 60/ Pitch Time

 

 

 

 

 

 

 

 

 

OP NO.

OPERATION DESCRIPTION

M/C

SAM

MAN POWER

HOURLY
CAPACITY

 

Difference

1

SHOULDER JOINT (B)

OL

0.40

1

150

 

-30

2

NK RIB MAKE & TURN OUT

OL

0.35

1

171

 

-9

3

NK RIB JOINT AT BODY

OL

0.25

1

240

 

60

4

MRK AT NK LBL JOINT PSN

H/W

0.15

1

400

 

220

5

LABEL JOINT AT NK PSN

LST

0.20

1

300

 

120

6

SLVE JOINT

OL

0.45

1

133

 

-47

7

SLVE CUFF MAKE

LST

0.25

1

240

 

60

8

SLVE CUFF TURN OUT

H/W

0.20

1

300

 

120

9

SLVE CUFF JOINT

OL

0.45

1

133

 

-47

10

BTM MAKE

OL

0.25

1

240

 

60

11

BTM HEM

OL

0.55

1

109

 

-71

12

OUT PUT TRIMING

H/W

0.50

1

120

 

-60

TOTAL

4.00

 

 

 

 

 

Pitch Time=

0.33

Piece Flow

180

   
                 

 

 

Even if you load the line based on its capacity, you might find the inventory accumulating due to an unbalanced production. Absenteeism and turnover can greatly affect the line's balance. A change in style and irregular feeding are two other factors that can put a line off-balance. To keep a line balanced you need information on the inventory levels. 

While allocating operator to the operation, the skill requirement for that operation should be kept in mind. To help regain balance in an unbalanced situation industrial engineer can use Utility operators, operator transfers and overtime as the last option.

 

 

Practically at first we will take the actual cycle time for individual operation of the line. Average of 5 cycle time should be taken in sec & converted into Min.

For Example:

Operations

Cycle Time (Sec)

Avg.

Time (Min)

Op-1

32

33

31

32

32

32

0.53

Op-2

45

47

43

46

44

45

0.75

 

 

Now Hourly Capacity of an Operator or Helper for That particular operation will be calculated including 15% allowance.

Hourly Capacity = 60/ Avg. Cycle Time (min) – Allowance%

 

Find out the Hourly Capacity for every operation. If same operation is done by more than one then the Hourly Capacity for that particular operation will be added together to get capacity.

Make a line graph by using hourly capacity to clearly realize the bottle neck of the line.

To increase the bottle neck capacity take help from higher operation capacity or include man or machine or method study.

By improving line bottle neck we can easily balance the line.